Motorola, Mesa, Tempe AZ. Electrical system design for numerous office space, lab, clean room and assembly/production line projects. Projects included remodeling existing facilities, shell build-outs and new building projects.
RODEL, INC., Phoenix, AZ. Electrical system designs for 5,000-sq. ft. of class 10/1000 clean rooms. Design included a new central plant waste treatment and D.I. water systems.
Motorola, Mesa, AZ.
Power, lighting and fire alarm system design for a new 3,900 sq. ft. multipurpose/executive presentation room with a construction budget of $1.2 million.
Electrical design for equipment fit-up of a new 11,000-sq. ft. raised floor computer data center.
Motorola, Tempe, AZ
Lighting, power, emergency telephone and security camera system design for new parking lots, at buildings 90 and 99. Lighting design complies with City of Tempe Planning Division CEPTED/Crime Prevention requirements.
Installation and power distribution design for a new 12,470kV-Delta to 277/480V-Y, 3200A double-ended substation with main tiebreaker for Buildings 90 and 93.
TRW Warehouse, Mesa, AZ. Electrical design for in-rack storage fire sprinkler system.
Ping (Karsten Manufacturing)
Putter assembly line relocation - power and lighting systems design.
Iron assembly line relocation/rework - power and lighting systems design.
Grinder line relocation/rework - power and lighting systems design.